Edthebrew Posted October 13, 2021 Share Posted October 13, 2021 Please can you add a lock feature to sub components on the bill for materials page so that a product cannot be made if a sub component is out of stock and marked as locked. e.g. Create a Tank of beer (Assembly level 1), Create a Cask of Beer (Assembly level 2 - Bulk process), Add Finings and Beer Duty (Assembly Level 3 - ready for sale) I Would want to lock assembly level 2 so that if I try to over create at level 3, if there is no stock prepared at level 2 it would stop the process and not create it for me automatically Link to comment Share on other sites More sharing options...
Administrators Ben Smith Posted October 14, 2021 Administrators Share Posted October 14, 2021 Thanks for this suggestion, to ensure its fed back to the right team can you advise which Sage product this is for please? Ben Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now